Rollover to zoom
Long Leading Lady Lace Front Wig by Jaclyn Smith
Fabulous long bob wig with a lace front and lush, beachy waves.
Item # A0070
Compare at $299.00
Sale $99.99 - $104.99
New
Sale
10 A $99.99
22 A $99.99
27 A $99.99
101 A $99.99
812 A $99.99
8 A $99.99
1426A A $99.99
1488A A $99.99
B3324 A $99.99
8274 A $99.99
1223HS8 A $99.99
33244 A $99.99
B827 A $99.99
4656604 A $99.99
SF1228 A $104.99
SF1316 A $104.99
SF61314 A $104.99
SF1026 A $104.99
Lush layers of soft, beachy waves give this fun and flirty long bob wig enviable volume, texture, and dimension. The fringeless, side-parted front effortlessly frames the face, and the full, wavy sides and back complete the carefree silhouette. Easy-care Kanekalon® synthetic fibers hold the style with minimal upkeep. The sheer lace front creates the illusion that hair is growing from your own scalp in a naturalistic hairline and allows off-the-face styling options. Extended neck allows more coverage of the nape of the neck so you can easily tuck away any stray hairs underneath. Length: 9.5" Front; 13.5" Top; 13.5" Crown; 10" Sides; 12" Upper Back; 8" Nape. Weight: 4.5 oz.
Select a Color
Select a Size
Qty:
Compare at
$299.00
Sale Price
$99.99 - $104.99
You save
$199.01 (67%) - $194.01 (65%)
Tell a Friend
* Prices vary based on sizing and color